MSCS09 code name “R2” – Sept10 CTP

What’s New: The following are new features that have been introduced since the Commerce Server 2009 “R2” May 2010 CTP release:

  • Storefront and component Web Parts are now designed for Microsoft SharePoint Server 2010 and Microsoft SharePoint Foundation 2010.
  • The SharePoint Commerce Services Configuration Wizard has been updated to enable IT Personnel or developers to deploy Commerce Server solutions to SharePoint 2010 and upgrade existing Commerce Sever 2009 Web Parts.

Important: The Microsoft Commerce Server 2009 code name “R2” will no longer include Microsoft SharePoint 2007 based solution storefront and component Web Parts.

Note: Given the pre-release nature of this release, not all functionality is currently available. The release is for evaluation purposes only and is not intended to be used in a production environment. The September CTP will stop functioning on December 31, 2012.